Netherfield Lane

Netherfield Lane is operational in Newark and Sherwood with a recorded capacity of 19.7 MW, and has been generating since 2015-03-23.

19.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-23
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Newark and Sherwood
Authority
England

Planning and build timeline

Application submitted2014-09-12
Permission granted2014-12-10
3 months after submission
Operational2015-03-23
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newark and Sherwood’s record on solar

Newark and Sherwood has decided 25 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in Newark and Sherwood

Other built sites within 15 km

SiteMWDistance
Welbeck Solar / Hazel Gap
Solar Photovoltaics · Operational
161.5 km
Welbeck Colliery
Solar Photovoltaics · Operational
11.33.2 km
Land South Off Ollerton Road
Solar Photovoltaics · Operational
4.25.4 km
Hunciecroft Farm
Solar Photovoltaics · Operational
87.2 km
Rufford Lane
Solar Photovoltaics · Operational
2.67.4 km
SPF Thirty Acres Farm
Solar Photovoltaics · Operational
3.87.6 km
Worksop - B&Q
Wind Onshore · Operational
27.7 km
Creswell Solar Park
Solar Photovoltaics · Operational
58.2 km

How big is Netherfield Lane?

Netherfield Lane has a recorded installed capacity of 19.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Netherfield Lane?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Netherfield Lane approved and built?

The application was submitted on 2014-09-12. Permission was granted on 2014-12-10, 3 months later. The site became operational on 2015-03-23, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2271.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council