Novarly ParcelRenewable sites

Renewable sitesLittle Morton Solar Farm

Little Morton Solar Farm

Little Morton Solar Farm is an operational 14.3 MW solar farm in Bassetlaw, generating since 31 March 2014. Planning permission was granted on 9 January 2014, 4 months after submission. Operator of record: Lightsource Renewable Energy.

14.3 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2014
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Bassetlaw
Authority
England

Planning and build timeline

Application submitted23 September 2013
Permission granted9 January 2014
4 months after submission
Operational31 March 2014
3 months after consent

Screening a site of your own?

RedlineUK · £39

Bassetlaw approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Little Morton Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bassetlaw’s record on solar

Bassetlaw has decided 23 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in Bassetlaw

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
271 km
Solar Photovoltaics · Operational
44.9 km
Wind Onshore · Operational
25.5 km
Solar Photovoltaics · Under Construction
49.95.7 km
Solar Photovoltaics · Operational
45.8 km
Solar Photovoltaics · Operational
86.4 km
Solar Photovoltaics · Operational
1.76.6 km
Anaerobic Digestion · Operational
36.9 km

How big is Little Morton Solar Farm?

Little Morton Solar Farm has a recorded installed capacity of 14.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Little Morton Solar Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Little Morton Solar Farm approved and built?

The application was submitted on 23 September 2013. Permission was granted on 9 January 2014, 4 months later. The site became operational on 31 March 2014, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1497.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode