Walkers Wood Solar Park is operational in Bassetlaw with a recorded capacity of 27 MW, and has been generating since 2015-03-10.

27 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-10
Solar Photovoltaics
Technology
Solar century / Magnetar Solar
Bassetlaw
Authority
England

Planning and build timeline

Application submitted2014-05-27
Permission granted2014-09-18
4 months after submission
Operational2015-03-10
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bassetlaw’s record on solar

Bassetlaw has decided 23 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in Bassetlaw

Other built sites within 15 km

SiteMWDistance
Little Morton Solar Farm
Solar Photovoltaics · Operational
14.31 km
Barnby Moor
Solar Photovoltaics · Operational
44.9 km
Worksop - B&Q
Wind Onshore · Operational
25.3 km
Tiln Farm Solar Farm
Solar Photovoltaics · Under Construction
49.95.3 km
Walmoor Farm solar park
Solar Photovoltaics · Operational
45.5 km
Tiln Farm solar park
Solar Photovoltaics · Operational
86 km
Tiln Farm Retford (extension)
Solar Photovoltaics · Operational
1.76.2 km
Sutton Grange AD Plant
Anaerobic Digestion · Operational
36.2 km

How big is Walkers Wood Solar Park?

Walkers Wood Solar Park has a recorded installed capacity of 27 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Walkers Wood Solar Park?

REPD records the operator as Solar century / Magnetar Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Walkers Wood Solar Park approved and built?

The application was submitted on 2014-05-27. Permission was granted on 2014-09-18, 4 months later. The site became operational on 2015-03-10, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2151.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council