Woodington Solar Farm is a 46 MW solar farm under construction in Test Valley. Planning permission was granted on 4 July 2017, 20 months after submission. Operator of record: Woodington Solar Limited.
Planning and build timeline
| Application submitted | 17 November 2015 |
| Permission granted | 4 July 2017 20 months after submission |
| Operational | not recorded |
Screening a site of your own?
Test Valley approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Woodington Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Test Valley’s record on solar
Test Valley has decided 37 solar farms and approved 95%, taking a median of 5 months. See every solar farm decision in Test Valley →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | — | 0 km |
Landfill Gas · Operational | 1 | 3.1 km |
Solar Photovoltaics · Operational | 5 | 4.3 km |
Solar Photovoltaics · Operational | 11 | 6.7 km |
Solar Photovoltaics · Operational | 5 | 6.7 km |
Battery · Under Construction | 20 | 7.4 km |
Solar Photovoltaics · Operational | 1.9 | 7.8 km |
Landfill Gas · Operational | 1.1 | 9.6 km |
How big is Woodington Solar Farm?
Woodington Solar Farm has a recorded installed capacity of 46 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Woodington Solar Farm?
REPD records the operator as Woodington Solar Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Woodington Solar Farm approved and built?
The application was submitted on 17 November 2015. Permission was granted on 4 July 2017, 20 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5883.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode