Renewable sitesTestwood Water Supply Works

Testwood Water Supply Works

Testwood Water Supply Works is operational in New Forest with a recorded capacity of 1.9 MW, and has been generating since 2017-08-24.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-08-24
Solar Photovoltaics
Technology
Southern Water Services
New Forest
Authority
England

Planning and build timeline

Application submitted2016-07-15
Permission granted2016-12-12
5 months after submission
Operational2017-08-24
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

New Forest’s record on solar

New Forest has decided 20 solar farms and approved 75%, taking a median of 2.2 months. See every solar farm decision in New Forest

Other built sites within 15 km

SiteMWDistance
Mill Lane, Nursling - Battery Storage Facility
Battery · Under Construction
201 km
Grove Solar Park (Phase 1)
Solar Photovoltaics · Operational
53.7 km
Grove Solar Park (Phase 2)
Solar Photovoltaics · Operational
113.7 km
Marchwood ERF
EfW Incineration · Operational
164.9 km
Tavells Lane Solar Farm
Solar Photovoltaics · Operational
5.35.1 km
Highwood Lane
Solar Photovoltaics · Operational
56.4 km
Squabb Wood
Landfill Gas · Operational
16.9 km
Woodington Solar Farm (Central)
Solar Photovoltaics · Under Construction
7.8 km

How big is Testwood Water Supply Works?

Testwood Water Supply Works has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Testwood Water Supply Works?

REPD records the operator as Southern Water Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Testwood Water Supply Works approved and built?

The application was submitted on 2016-07-15. Permission was granted on 2016-12-12, 5 months later. The site became operational on 2017-08-24, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6329.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council