Renewable sites › Whiteparish
Whiteparish
Whiteparish is an operational 1.1 MW landfill gas site in Wiltshire, generating since 1 August 2004. Planning permission was granted on 18 December 2003, 4 months after submission. Operator of record: Biffa.
Planning and build timeline
| Application submitted | 11 August 2003 |
| Permission granted | 18 December 2003 4 months after submission |
| Operational | 1 August 2004 7 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Wiltshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Whiteparish’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 46 | 9.6 km |
Solar Photovoltaics · Under Construction | — | 9.6 km |
Solar Photovoltaics · Operational | 5 | 10.2 km |
Landfill Gas · Operational | 1 | 12.4 km |
Battery · Under Construction | 49.5 | 13 km |
Solar Photovoltaics · Operational | 5 | 13.7 km |
Solar Photovoltaics · Operational | 12.3 | 15 km |
How big is Whiteparish?
Whiteparish has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Whiteparish?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Whiteparish approved and built?
The application was submitted on 11 August 2003. Permission was granted on 18 December 2003, 4 months later. The site became operational on 1 August 2004, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 655.
Novarly Parcel · official public data, read properly · parcel.novarly.com