Renewable sites › MARCH SEWAGE TREATMENT WORKS - WIND TURBINE
MARCH SEWAGE TREATMENT WORKS - WIND TURBINE
MARCH SEWAGE TREATMENT WORKS - WIND TURBINE is an operational 2 MW onshore wind farm in Fenland, generating since 1 September 2012. Planning permission was granted on 20 February 2009, 19 months after submission. Operator of record: TCI Renewables.
Planning and build timeline
| Application submitted | 18 July 2007 |
| Permission granted | 20 February 2009 19 months after submission |
| Operational | 1 September 2012 42 months after consent |
Screening a site of your own?
Fenland approves 85% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with MARCH SEWAGE TREATMENT WORKS - WIND TURBINE’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Fenland’s record on onshore wind
Fenland has decided 20 onshore wind schemes and approved 85%, taking a median of 12.8 months. See every onshore wind scheme decision in Fenland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 2 | 0.2 km |
Wind Onshore · Operational | 18 | 0.2 km |
Wind Onshore · Operational | 2 | 2.2 km |
Wind Onshore · Operational | 14 | 2.7 km |
Wind Onshore · Operational | 16 | 3.4 km |
Wind Onshore · Operational | 14 | 3.5 km |
Anaerobic Digestion · Operational | 1.5 | 4 km |
Wind Onshore · Operational | 10.3 | 5.8 km |
How big is MARCH SEWAGE TREATMENT WORKS - WIND TURBINE?
MARCH SEWAGE TREATMENT WORKS - WIND TURBINE has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates MARCH SEWAGE TREATMENT WORKS - WIND TURBINE?
REPD records the operator as TCI Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was MARCH SEWAGE TREATMENT WORKS - WIND TURBINE approved and built?
The application was submitted on 18 July 2007. Permission was granted on 20 February 2009, 19 months later. The site became operational on 1 September 2012, 42 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2875.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode