Winscales Moor

Winscales Moor is operational in Cumberland with a recorded capacity of 6 MW, and has been generating since 2009-05-01.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-05-01
Wind Onshore
Technology
Gravis Capital Management
Cumberland
Authority
England

Planning and build timeline

Application submitted2006-10-01
Permission granted2007-06-20
9 months after submission
Operational2009-05-01
22 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Winscales Phase I and II
Wind Onshore · Operational
8.81.6 km
Shearman Field
Landfill Gas · Operational
1.93.7 km
Moorhouse Farm
Solar Photovoltaics · Operational
53.8 km
Wythegill Wind Turbine
Wind Onshore · Operational
2.33.9 km
St Helen's Lane
Solar Photovoltaics · Operational
54 km
Iggesund Paperboard CHP Plant
Biomass (dedicated) · Operational
494.1 km
Eastman Chemicals, Workington
Wind Onshore · Operational
44.3 km
Oldside Wind Farm
Wind Onshore · Operational
5.44.3 km

How big is Winscales Moor?

Winscales Moor has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Winscales Moor?

REPD records the operator as Gravis Capital Management. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Winscales Moor approved and built?

The application was submitted on 2006-10-01. Permission was granted on 2007-06-20, 9 months later. The site became operational on 2009-05-01, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2986.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council