Iggesund Paperboard CHP Plant

Iggesund Paperboard CHP Plant is operational in Cumberland with a recorded capacity of 49 MW, and has been generating since 2013-02-17.

49 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-02-17
Biomass (dedicated)
Technology
Iggesund Paperboard (Workington)
Cumberland
Authority
England

Planning and build timeline

Application submitted2010-11-17
Permission granted2011-03-08
4 months after submission
Operational2013-02-17
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Oldside Wind Farm
Wind Onshore · Operational
5.40.8 km
Eastman Chemicals, Workington
Wind Onshore · Operational
40.9 km
Siddick Wind Farm
Wind Onshore · Operational
4.21.2 km
St Helen's Lane
Solar Photovoltaics · Operational
51.8 km
Wythegill Wind Turbine
Wind Onshore · Operational
2.31.9 km
Land at Flimby Hall Farm
Wind Onshore · Operational
6.23.4 km
Winscales Moor
Wind Onshore · Operational
64.1 km
Winscales Phase I and II
Wind Onshore · Operational
8.84.8 km

How big is Iggesund Paperboard CHP Plant?

Iggesund Paperboard CHP Plant has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Iggesund Paperboard CHP Plant?

REPD records the operator as Iggesund Paperboard (Workington). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Iggesund Paperboard CHP Plant approved and built?

The application was submitted on 2010-11-17. Permission was granted on 2011-03-08, 4 months later. The site became operational on 2013-02-17, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 47.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council