Novarly ParcelRenewable sites

Renewable sitesOldside Wind Farm

Oldside Wind Farm

Oldside Wind Farm is operational in Cumberland with a recorded capacity of 5.4 MW, and has been generating since 1996-09-01.

5.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-09-01
Wind Onshore
Technology
Windprospect / Windcluster
Cumberland
Authority
England

Planning and build timeline

Application submitted1995-10-31
Permission granted1996-01-10
2 months after submission
Operational1996-09-01
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Iggesund Paperboard CHP Plant
Biomass (dedicated) · Operational
490.8 km
Eastman Chemicals, Workington
Wind Onshore · Operational
41.7 km
Siddick Wind Farm
Wind Onshore · Operational
4.21.8 km
St Helen's Lane
Solar Photovoltaics · Operational
52.5 km
Wythegill Wind Turbine
Wind Onshore · Operational
2.32.7 km
Land at Flimby Hall Farm
Wind Onshore · Operational
6.24.1 km
Winscales Moor
Wind Onshore · Operational
64.3 km
Winscales Phase I and II
Wind Onshore · Operational
8.84.8 km

How big is Oldside Wind Farm?

Oldside Wind Farm has a recorded installed capacity of 5.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Oldside Wind Farm?

REPD records the operator as Windprospect / Windcluster. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Oldside Wind Farm approved and built?

The application was submitted on 1995-10-31. Permission was granted on 1996-01-10, 2 months later. The site became operational on 1996-09-01, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2625.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council