Novarly ParcelRenewable sites

Renewable sitesEastman Chemicals, Workington

Eastman Chemicals, Workington

Eastman Chemicals, Workington is an operational 4 MW onshore wind farm in Cumberland, generating since 1 October 2006. Planning permission was granted on 8 September 2003, 2 months after submission. Operator of record: Unknown.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2006
Wind Onshore
Technology
Unknown
Cumberland
Authority
England

Planning and build timeline

Application submitted24 June 2003
Permission granted8 September 2003
2 months after submission
Operational1 October 2006
37 months after consent

Screening a site of your own?

RedlineUK · £39

Cumberland approves 66% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Eastman Chemicals, Workington’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
4.20.4 km
Biomass (dedicated) · Operational
490.9 km
Solar Photovoltaics · Operational
51 km
Wind Onshore · Operational
2.31.1 km
Wind Onshore · Operational
5.41.7 km
Wind Onshore · Operational
6.22.4 km
Wind Onshore · Operational
64.3 km
Wind Onshore · Operational
8.85.3 km

How big is Eastman Chemicals, Workington?

Eastman Chemicals, Workington has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eastman Chemicals, Workington?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eastman Chemicals, Workington approved and built?

The application was submitted on 24 June 2003. Permission was granted on 8 September 2003, 2 months later. The site became operational on 1 October 2006, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2935.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode