Novarly ParcelRenewable sites

Renewable sitesMoorhouse Farm

Moorhouse Farm

Moorhouse Farm is an operational 5 MW solar farm in Cumberland, generating since 30 November 2016. Planning permission was granted on 21 March 2016, 15 months after submission. Operator of record: Solar Park Developments.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 30 November 2016
Solar Photovoltaics
Technology
Solar Park Developments
Cumberland
Authority
England

Planning and build timeline

Application submitted17 December 2014
Permission granted21 March 2016
15 months after submission
Operational30 November 2016
8 months after consent

Screening a site of your own?

RedlineUK · £39

Cumberland approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Moorhouse Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on solar

Cumberland has decided 28 solar farms and approved 93%, taking a median of 2.9 months. See every solar farm decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.91.5 km
Landfill Gas · Operational
1.81.6 km
Wind Onshore · Operational
62.1 km
Wind Onshore · Operational
8.82.3 km
Wind Onshore · Operational
4.73.2 km
Wind Onshore · Operational
63.8 km
Wind Onshore · Operational
6.54 km
Wind Onshore · Operational
5.45.4 km

How big is Moorhouse Farm?

Moorhouse Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Moorhouse Farm?

REPD records the operator as Solar Park Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Moorhouse Farm approved and built?

The application was submitted on 17 December 2014. Permission was granted on 21 March 2016, 15 months later. The site became operational on 30 November 2016, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4903.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode