Middlewick wind farm is operational in Maldon with a recorded capacity of 20.7 MW, and has been generating since 2014-07-31.

20.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-31
Wind Onshore
Technology
Blue Energy (formerly Ridgewind Ltd)
Maldon
Authority
England

Planning and build timeline

Application submitted2010-01-05
Permission granted2011-05-01
16 months after submission
Operational2014-07-31
39 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Turncole Wind Farm
Wind Onshore · Operational
17.52.1 km
Wick Farm (Burnham on Crouch)
Solar Photovoltaics · Operational
55.3 km
Bradwell Wind Farm (Repower)
Wind Onshore · Operational
207.2 km
Barling Hall Farm
Landfill Gas · Operational
2.411.5 km
Fambridge Road/Canewdon Road
Solar Photovoltaics · Operational
514.3 km
South Fambridge Hall - Solar farm & Battery storage
Solar Photovoltaics · Under Construction
49.9914.7 km
South Fambridge Hall - Solar farm & Battery storage
Battery · Under Construction
2014.7 km

How big is Middlewick wind farm?

Middlewick wind farm has a recorded installed capacity of 20.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Middlewick wind farm?

REPD records the operator as Blue Energy (formerly Ridgewind Ltd). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Middlewick wind farm approved and built?

The application was submitted on 2010-01-05. Permission was granted on 2011-05-01, 16 months later. The site became operational on 2014-07-31, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4662.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council