Middlewick wind farm is an operational 20.7 MW onshore wind farm in Maldon, generating since 31 July 2014. Planning permission was granted on 1 May 2011, 16 months after submission. Operator of record: Blue Energy (formerly Ridgewind Ltd).

20.7 MW
Capacity
as recorded in REPD
Operational
Status
since 31 July 2014
Wind Onshore
Technology
Blue Energy (formerly Ridgewind Ltd)
Maldon
Authority
England

Planning and build timeline

Application submitted5 January 2010
Permission granted1 May 2011
16 months after submission
Operational31 July 2014
39 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Maldon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Middlewick wind farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
17.52.1 km
Solar Photovoltaics · Operational
55.3 km
Wind Onshore · Operational
207.2 km
Landfill Gas · Operational
2.411.5 km
Solar Photovoltaics · Operational
514.3 km
Solar Photovoltaics · Under Construction
49.9914.7 km
Battery · Under Construction
2014.7 km

How big is Middlewick wind farm?

Middlewick wind farm has a recorded installed capacity of 20.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Middlewick wind farm?

REPD records the operator as Blue Energy (formerly Ridgewind Ltd). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Middlewick wind farm approved and built?

The application was submitted on 5 January 2010. Permission was granted on 1 May 2011, 16 months later. The site became operational on 31 July 2014, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4662.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode