Taff Ely Wind Farm
Taff Ely Wind Farm is an operational 9 MW onshore wind farm in Rhondda Cynon Taf, generating since 1 October 1993. REPD does not record the planning grant date. Operator of record: Npower Renewables.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 October 1993 |
Screening a site of your own?
Rhondda Cynon Taf approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Taff Ely Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Rhondda Cynon Taf’s record on onshore wind
Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 12 | 1.5 km |
Wind Onshore · Operational | 9.4 | 1.5 km |
Wind Onshore · Operational | 2.5 | 3 km |
Solar Photovoltaics · Under Construction | 6 | 3.2 km |
Wind Onshore · Operational | 20 | 4.4 km |
Wind Onshore · Operational | 17.5 | 4.7 km |
Wind Onshore · Operational | 10 | 5.1 km |
Wind Onshore · Operational | 1.5 | 5.2 km |
How big is Taff Ely Wind Farm?
Taff Ely Wind Farm has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Taff Ely Wind Farm?
REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Taff Ely Wind Farm approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 October 1993.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2776.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode