Taff Ely Wind Farm

Taff Ely Wind Farm is operational in Rhondda Cynon Taf with a recorded capacity of 9 MW, and has been generating since 1993-10-01.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 1993-10-01
Wind Onshore
Technology
Npower Renewables
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1993-10-01

Rhondda Cynon Taf’s record on onshore wind

Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Mynydd Portref Wind Farm extension
Wind Onshore · Operational
121.5 km
Mynydd Portref
Wind Onshore · Operational
9.41.5 km
Graig Fatha Farm
Wind Onshore · Operational
2.53 km
Coed Ely - Solar Farm
Solar Photovoltaics · Under Construction
63.2 km
Pant y wal extension
Wind Onshore · Operational
204.4 km
Fforch Nest Wind Farm pt2
Wind Onshore · Operational
17.54.7 km
Fforch Nest Wind Farm pt1
Wind Onshore · Operational
105.1 km
West of Rhiwfelin Fach Farm
Wind Onshore · Operational
1.55.2 km

How big is Taff Ely Wind Farm?

Taff Ely Wind Farm has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Taff Ely Wind Farm?

REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Taff Ely Wind Farm approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1993-10-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2776.