Taff Ely Wind Farm is operational in Rhondda Cynon Taf with a recorded capacity of 9 MW, and has been generating since 1993-10-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1993-10-01 |
Rhondda Cynon Taf’s record on onshore wind
Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Mynydd Portref Wind Farm extension Wind Onshore · Operational | 12 | 1.5 km |
Mynydd Portref Wind Onshore · Operational | 9.4 | 1.5 km |
Graig Fatha Farm Wind Onshore · Operational | 2.5 | 3 km |
Coed Ely - Solar Farm Solar Photovoltaics · Under Construction | 6 | 3.2 km |
Pant y wal extension Wind Onshore · Operational | 20 | 4.4 km |
Fforch Nest Wind Farm pt2 Wind Onshore · Operational | 17.5 | 4.7 km |
Fforch Nest Wind Farm pt1 Wind Onshore · Operational | 10 | 5.1 km |
West of Rhiwfelin Fach Farm Wind Onshore · Operational | 1.5 | 5.2 km |
How big is Taff Ely Wind Farm?
Taff Ely Wind Farm has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Taff Ely Wind Farm?
REPD records the operator as Npower Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Taff Ely Wind Farm approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1993-10-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2776.