Wheal Jane is operational in Cornwall with a recorded capacity of 1.4 MW, and has been generating since 2011-07-06.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-06
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Cornwall
Authority
England

Planning and build timeline

Application submitted2010-06-21
Permission granted2010-09-17
3 months after submission
Operational2011-07-06
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
St Day II
Landfill Gas · Operational
22.7 km
United Downs Project (Geothermal)
Hot Dry Rocks (HDR) · Operational
33 km
United Mines Landfill Scheme
Landfill Gas · Operational
33.9 km
Causilgey Solar Farm
Solar Photovoltaics · Operational
55.4 km
Pencoose Farm
Solar Photovoltaics · Operational
8.55.4 km
Garvinack Farm Solar Park
Solar Photovoltaics · Operational
75.8 km
Four Burrows Wind Farm
Wind Onshore · Operational
4.55.8 km
Four Burrows Farm (Extension 2)
Solar Photovoltaics · Operational
6.36.1 km

How big is Wheal Jane?

Wheal Jane has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wheal Jane?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wheal Jane approved and built?

The application was submitted on 2010-06-21. Permission was granted on 2010-09-17, 3 months later. The site became operational on 2011-07-06, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1032.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council