Renewable sites › St Day II
St Day II
St Day II is an operational 2 MW landfill gas site in Cornwall, generating since 1 June 2003. Planning permission was granted on 1 June 2003, 5 months after submission. Operator of record: Unknown.
Planning and build timeline
| Application submitted | 1 January 2003 |
| Permission granted | 1 June 2003 5 months after submission |
| Operational | 1 June 2003 0 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Cornwall: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with St Day II’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- World Heritage Site — Cornwall and West Devon Mining Landscape
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hot Dry Rocks (HDR) · Operational | 3 | 0.7 km |
Landfill Gas · Operational | 3 | 1.2 km |
Solar Photovoltaics · Operational | 1.4 | 2.7 km |
Solar Photovoltaics · Operational | 8.5 | 4.4 km |
Wind Onshore · Operational | 4.5 | 6 km |
Solar Photovoltaics · Operational | 5 | 6.1 km |
Solar Photovoltaics · Operational | 6.3 | 6.2 km |
Solar Photovoltaics · Operational | 8 | 6.2 km |
How big is St Day II?
St Day II has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates St Day II?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was St Day II approved and built?
The application was submitted on 1 January 2003. Permission was granted on 1 June 2003, 5 months later. The site became operational on 1 June 2003, 0 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 632.