Four Burrows Wind Farm

Four Burrows Wind Farm is operational in Cornwall with a recorded capacity of 4.5 MW, and has been generating since 1998-03-01.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1998-03-01
Wind Onshore
Technology
Renewable Energy Systems (RES)
Cornwall
Authority
England

Planning and build timeline

Application submitted1994-11-22
Permission granted1995-03-09
4 months after submission
Operational1998-03-01
36 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on onshore wind

Cornwall has decided 35 onshore wind schemes and approved 74%, taking a median of 7.5 months. See every onshore wind scheme decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Four Burrows Farm (Extension 2)
Solar Photovoltaics · Operational
6.30.3 km
Garvinack Farm Solar Park
Solar Photovoltaics · Operational
71.2 km
Causilgey Solar Farm
Solar Photovoltaics · Operational
51.2 km
Four Burrows Solar farm (Extension 1)
Solar Photovoltaics · Operational
1.51.7 km
Four Burrows Solar farm
Solar Photovoltaics · Operational
7.21.7 km
Nanteague Farm
Solar Photovoltaics · Operational
7.73.6 km
Gover Farm Solar Park
Solar Photovoltaics · Operational
84.2 km
Chynoweth Farm
Solar Photovoltaics · Operational
2.94.3 km

How big is Four Burrows Wind Farm?

Four Burrows Wind Farm has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Four Burrows Wind Farm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Four Burrows Wind Farm approved and built?

The application was submitted on 1994-11-22. Permission was granted on 1995-03-09, 4 months later. The site became operational on 1998-03-01, 36 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3578.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council