Novarly ParcelRenewable sites

Renewable sitesAirfield Farm (Podington)

Airfield Farm (Podington)

Airfield Farm (Podington) is an operational 8.6 MW onshore wind farm in Bedford, generating since 15 February 2017. Planning permission was granted on 21 August 2012, 47 months after submission. Operator of record: Airvolution Energy.

8.6 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2017
Wind Onshore
Technology
Airvolution Energy
Bedford
Authority
England

Planning and build timeline

Application submitted25 September 2008
Permission granted21 August 2012
47 months after submission
Operational15 February 2017
54 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bedford: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Airfield Farm (Podington)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
16.81 km
Solar Photovoltaics · Operational
152.3 km
Anaerobic Digestion · Operational
24.2 km
Solar Photovoltaics · Operational
266.3 km
Solar Photovoltaics · Operational
4.66.7 km
Solar Photovoltaics · Operational
8.57.7 km
Wind Onshore · Operational
12.58.7 km
Solar Photovoltaics · Operational
59.3 km

How big is Airfield Farm (Podington)?

Airfield Farm (Podington) has a recorded installed capacity of 8.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Airfield Farm (Podington)?

REPD records the operator as Airvolution Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Airfield Farm (Podington) approved and built?

The application was submitted on 25 September 2008. Permission was granted on 21 August 2012, 47 months later. The site became operational on 15 February 2017, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4116.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode