Novarly ParcelRenewable sites

Renewable sitesSouthall Lane Waste Depot

Southall Lane Waste Depot

Southall Lane Waste Depot is operational in Hounslow, and has been generating since 2020-01-01.

Capacity
as recorded in REPD
Operational
Status
since 2020-01-01
Battery
Technology
London Borough of Hounslow
Hounslow
Authority
England

Planning and build timeline

Application submitted2017-06-22
Permission grantednot recorded
Operational2020-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Western International Market
Solar Photovoltaics · Operational
1.70.1 km
Western International Market (WIM) Site
Battery · Operational
0.20.2 km
Heathrow Airport Biomass CHP
Biomass (dedicated) · Operational
1.85.5 km
Mogden STW
Sewage Sludge Digestion · Operational
5.85.8 km
Kneller Hall School
Solar Photovoltaics · Under Construction
0.255.9 km
Lakeside EfW
EfW Incineration · Operational
308.3 km
Colnbrook Landfill
Landfill Gas · Operational
1.98.5 km
Ham Close - 452 Houses, Flats & Leisure Centre
Solar Photovoltaics · Under Construction
0.438.9 km

How big is Southall Lane Waste Depot?

REPD does not record an installed capacity for Southall Lane Waste Depot.

Who operates Southall Lane Waste Depot?

REPD records the operator as London Borough of Hounslow. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Southall Lane Waste Depot approved and built?

The application was submitted on 2017-06-22. REPD does not record a grant date. The site became operational on 2020-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7004.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council