Renewable sites › Southall Lane Waste Depot
Southall Lane Waste Depot
Southall Lane Waste Depot is operational in Hounslow, and has been generating since 2020-01-01.
Planning and build timeline
| Application submitted | 2017-06-22 |
| Permission granted | not recorded |
| Operational | 2020-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
- Green Belt — Hounslow
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Western International Market Solar Photovoltaics · Operational | 1.7 | 0.1 km |
Western International Market (WIM) Site Battery · Operational | 0.2 | 0.2 km |
Heathrow Airport Biomass CHP Biomass (dedicated) · Operational | 1.8 | 5.5 km |
Mogden STW Sewage Sludge Digestion · Operational | 5.8 | 5.8 km |
Kneller Hall School Solar Photovoltaics · Under Construction | 0.25 | 5.9 km |
Lakeside EfW EfW Incineration · Operational | 30 | 8.3 km |
Colnbrook Landfill Landfill Gas · Operational | 1.9 | 8.5 km |
Ham Close - 452 Houses, Flats & Leisure Centre Solar Photovoltaics · Under Construction | 0.43 | 8.9 km |
How big is Southall Lane Waste Depot?
REPD does not record an installed capacity for Southall Lane Waste Depot.
Who operates Southall Lane Waste Depot?
REPD records the operator as London Borough of Hounslow. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Southall Lane Waste Depot approved and built?
The application was submitted on 2017-06-22. REPD does not record a grant date. The site became operational on 2020-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7004.
Novarly Parcel · official public data, read properly · parcel.novarly.com