Novarly ParcelRenewable sites

Renewable sitesSanko Gosei Solar Panels

Sanko Gosei Solar Panels

Sanko Gosei Solar Panels is operational in West Lancashire with a recorded capacity of 0.5 MW, and has been generating since 2021-10-10.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-10-10
Solar Photovoltaics
Technology
Sanko Gosei UK Limited
West Lancashire
Authority
England

Planning and build timeline

Application submitted2020-12-16
Permission granted2021-02-04
2 months after submission
Operational2021-10-10
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Lancashire’s record on solar

West Lancashire has decided 13 solar farms and approved 77%, taking a median of 1.9 months. See every solar farm decision in West Lancashire

Other built sites within 15 km

SiteMWDistance
Unit 5 XL Business Park
Battery · Under Construction
49.90.6 km
Lathom (Pilkington Technical Centre) Battery Storage
Battery · Operational
21.9 km
Lathom (Pilkington Technical Centre)
Solar Photovoltaics · Operational
2.51.9 km
Holiday Moss Landfill Gas Scheme
Landfill Gas · Operational
2.95.6 km
Holiday Moss Gas to Energy II
Landfill Gas · Operational
1.45.6 km
West Quarry
Landfill Gas · Operational
4.55.7 km
PROMISED LAND FARM
Wind Onshore · Operational
16.7 km
Billinge Hill Quarry Landfill Scheme
Landfill Gas · Operational
18 km

How big is Sanko Gosei Solar Panels?

Sanko Gosei Solar Panels has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sanko Gosei Solar Panels?

REPD records the operator as Sanko Gosei UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sanko Gosei Solar Panels approved and built?

The application was submitted on 2020-12-16. Permission was granted on 2021-02-04, 2 months later. The site became operational on 2021-10-10, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8165.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council