West Carclaze Solar Farm

West Carclaze Solar Farm is operational in Cornwall with a recorded capacity of 6.5 MW, and has been generating since 2017-03-29.

6.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-29
Solar Photovoltaics
Technology
Canadian Solar
Cornwall
Authority
England

Planning and build timeline

Application submitted2015-05-28
Permission granted2015-08-28
3 months after submission
Operational2017-03-29
19 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Eden Project Geothermal Energy Facility
Hot Dry Rocks (HDR) · Under Construction
72.4 km
Eden Geothermal Limited - Eden Project Energy Centre
Geothermal · Operational
2.9 km
Goonamarth Farm - Wind Turbine
Wind Onshore · Under Construction
4.33 km
Manor Farm
Solar Photovoltaics · Operational
4.74.6 km
Trenoweth Solar Farm
Solar Photovoltaics · Operational
2.54.7 km
Tredinnick Fields
Solar Photovoltaics · Operational
5.85.3 km
Bodwen Solar Park
Solar Photovoltaics · Operational
5.55.4 km
Land at Gilley's Mill Dam
Solar Photovoltaics · Operational
55.5 km

How big is West Carclaze Solar Farm?

West Carclaze Solar Farm has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West Carclaze Solar Farm?

REPD records the operator as Canadian Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West Carclaze Solar Farm approved and built?

The application was submitted on 2015-05-28. Permission was granted on 2015-08-28, 3 months later. The site became operational on 2017-03-29, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5202.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council