Bodwen Solar Park
Bodwen Solar Park is operational in Cornwall with a recorded capacity of 5.5 MW, and has been generating since 2017-02-15.
Planning and build timeline
| Application submitted | 2013-05-22 |
| Permission granted | 2015-03-24 22 months after submission |
| Operational | 2017-02-15 23 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tredinnick Fields Solar Photovoltaics · Operational | 5.8 | 1.5 km |
Woodlands Barton Solar Farm Solar Photovoltaics · Operational | 4.9 | 2.3 km |
Trenoweth Solar Farm Solar Photovoltaics · Operational | 2.5 | 2.6 km |
Woodlands Barton Wind Project Wind Onshore · Operational | 4.6 | 3 km |
Clann Solar Farm Solar Photovoltaics · Operational | 1.4 | 3.3 km |
Kerriers Solar Park Solar Photovoltaics · Operational | 9.6 | 4.4 km |
Eden Geothermal Limited - Eden Project Energy Centre Geothermal · Operational | — | 4.8 km |
Eden Project Geothermal Energy Facility Hot Dry Rocks (HDR) · Under Construction | 7 | 5 km |
How big is Bodwen Solar Park?
Bodwen Solar Park has a recorded installed capacity of 5.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bodwen Solar Park?
REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bodwen Solar Park approved and built?
The application was submitted on 2013-05-22. Permission was granted on 2015-03-24, 22 months later. The site became operational on 2017-02-15, 23 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1639.
Novarly Parcel · official public data, read properly · parcel.novarly.com