Renewable sites › Eden Project Geothermal Energy Facility
Eden Project Geothermal Energy Facility
Eden Project Geothermal Energy Facility is a 7 MW geothermal plant under construction in Cornwall. Planning permission was granted on 16 December 2010, 4 months after submission. Operator of record: EGS Energy/Eden Project Limited.
Planning and build timeline
| Application submitted | 9 August 2010 |
| Permission granted | 16 December 2010 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Cornwall: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Eden Project Geothermal Energy Facility’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Geothermal · Operational | — | 0.5 km |
Solar Photovoltaics · Operational | 6.5 | 2.4 km |
Solar Photovoltaics · Operational | 2.5 | 3.1 km |
Solar Photovoltaics · Operational | 5.8 | 4.2 km |
Solar Photovoltaics · Operational | 5.5 | 5 km |
Wind Onshore · Under Construction | 4.3 | 5.4 km |
Solar Photovoltaics · Operational | 4.7 | 6.9 km |
Solar Photovoltaics · Operational | 4.9 | 7.1 km |
How big is Eden Project Geothermal Energy Facility?
Eden Project Geothermal Energy Facility has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Eden Project Geothermal Energy Facility?
REPD records the operator as EGS Energy/Eden Project Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Eden Project Geothermal Energy Facility approved and built?
The application was submitted on 9 August 2010. Permission was granted on 16 December 2010, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4692.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode