Renewable sites › Eden Project Geothermal Energy Facility
Eden Project Geothermal Energy Facility
Eden Project Geothermal Energy Facility is under construction in Cornwall with a recorded capacity of 7 MW.
Planning and build timeline
| Application submitted | 2010-08-09 |
| Permission granted | 2010-12-16 4 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Eden Geothermal Limited - Eden Project Energy Centre Geothermal · Operational | — | 0.5 km |
West Carclaze Solar Farm Solar Photovoltaics · Operational | 6.5 | 2.4 km |
Trenoweth Solar Farm Solar Photovoltaics · Operational | 2.5 | 3.1 km |
Tredinnick Fields Solar Photovoltaics · Operational | 5.8 | 4.2 km |
Bodwen Solar Park Solar Photovoltaics · Operational | 5.5 | 5 km |
Goonamarth Farm - Wind Turbine Wind Onshore · Under Construction | 4.3 | 5.4 km |
Manor Farm Solar Photovoltaics · Operational | 4.7 | 6.9 km |
Woodlands Barton Solar Farm Solar Photovoltaics · Operational | 4.9 | 7.1 km |
How big is Eden Project Geothermal Energy Facility?
Eden Project Geothermal Energy Facility has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Eden Project Geothermal Energy Facility?
REPD records the operator as EGS Energy/Eden Project Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Eden Project Geothermal Energy Facility approved and built?
The application was submitted on 2010-08-09. Permission was granted on 2010-12-16, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4692.