Renewable sites › Wern Ddu Wind Farm
Wern Ddu Wind Farm
Wern Ddu Wind Farm is an operational 9.2 MW onshore wind farm in Denbighshire, generating since 1 March 2010. Planning permission was granted on 26 January 2005, 9 months after submission. Operator of record: Tegni.
Planning and build timeline
| Application submitted | 23 April 2004 |
| Permission granted | 26 January 2005 9 months after submission |
| Operational | 1 March 2010 61 months after consent |
Screening a site of your own?
Denbighshire approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Wern Ddu Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Denbighshire’s record on onshore wind
Denbighshire has decided 5 onshore wind schemes and approved 80%, taking a median of 11 months. See every onshore wind scheme decision in Denbighshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.2 | 5 km |
Wind Onshore · Operational | 1.5 | 6.3 km |
Wind Onshore · Operational | 96 | 7.5 km |
Wind Onshore · Operational | 37.6 | 11.3 km |
Wind Onshore · Operational | 21.3 | 11.7 km |
Biomass (dedicated) · Operational | 3 | 12 km |
Wind Onshore · Operational | 2.6 | 12.7 km |
How big is Wern Ddu Wind Farm?
Wern Ddu Wind Farm has a recorded installed capacity of 9.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wern Ddu Wind Farm?
REPD records the operator as Tegni. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wern Ddu Wind Farm approved and built?
The application was submitted on 23 April 2004. Permission was granted on 26 January 2005, 9 months later. The site became operational on 1 March 2010, 61 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3592.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode