Renewable sites › Clocaenog Forest Wind Farm
Clocaenog Forest Wind Farm
Clocaenog Forest Wind Farm is an operational 96 MW onshore wind farm in Wales, generating since 1 October 2019. Planning permission was granted on 12 September 2014, 17 months after submission. Operator of record: RWE Innogy UK.
Planning and build timeline
| Application submitted | 23 April 2013 |
| Permission granted | 12 September 2014 17 months after submission |
| Operational | 1 October 2019 61 months after consent |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Clocaenog Forest Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 37.6 | 4.3 km |
Wind Onshore · Operational | 21.3 | 5.1 km |
Wind Onshore · Operational | 1.5 | 6 km |
Wind Onshore · Operational | 9.2 | 7.5 km |
Solar Photovoltaics · Operational | 1.2 | 9.8 km |
Wind Onshore · Operational | 2.6 | 10.7 km |
Biomass (dedicated) · Operational | 3 | 12.5 km |
How big is Clocaenog Forest Wind Farm?
Clocaenog Forest Wind Farm has a recorded installed capacity of 96 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Clocaenog Forest Wind Farm?
REPD records the operator as RWE Innogy UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Clocaenog Forest Wind Farm approved and built?
The application was submitted on 23 April 2013. Permission was granted on 12 September 2014, 17 months later. The site became operational on 1 October 2019, 61 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4552.