Renewable sites › Blazer Fuels
Blazer Fuels
Blazer Fuels is operational in Denbighshire with a recorded capacity of 3 MW, and has been generating since 2017-03-31.
Planning and build timeline
| Application submitted | 2015-11-02 |
| Permission granted | 2015-12-22 2 months after submission |
| Operational | 2017-03-31 15 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tir Mostyn And Foel Goch Wind Farm Wind Onshore · Operational | 21.3 | 11.3 km |
Wern Ddu Wind Farm Wind Onshore · Operational | 9.2 | 12 km |
Brenig Wind Farm Wind Onshore · Operational | 37.6 | 12.1 km |
Clocaenog Forest Wind Farm Wind Onshore · Operational | 96 | 12.5 km |
How big is Blazer Fuels?
Blazer Fuels has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Blazer Fuels?
REPD records the operator as Newbridge Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blazer Fuels approved and built?
The application was submitted on 2015-11-02. Permission was granted on 2015-12-22, 2 months later. The site became operational on 2017-03-31, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6228.
Novarly Parcel · official public data, read properly · parcel.novarly.com