Renewable sites › Blazer Fuels
Blazer Fuels
Blazer Fuels is an operational 3 MW biomass plant in Denbighshire, generating since 31 March 2017. Planning permission was granted on 22 December 2015, 2 months after submission. Operator of record: Newbridge Energy.
Planning and build timeline
| Application submitted | 2 November 2015 |
| Permission granted | 22 December 2015 2 months after submission |
| Operational | 31 March 2017 15 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Denbighshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Blazer Fuels’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 21.3 | 11.3 km |
Wind Onshore · Operational | 9.2 | 12 km |
Wind Onshore · Operational | 37.6 | 12.1 km |
Wind Onshore · Operational | 96 | 12.5 km |
How big is Blazer Fuels?
Blazer Fuels has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Blazer Fuels?
REPD records the operator as Newbridge Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blazer Fuels approved and built?
The application was submitted on 2 November 2015. Permission was granted on 22 December 2015, 2 months later. The site became operational on 31 March 2017, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6228.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode