Rhug Estate

Rhug Estate is an operational 1.2 MW solar farm in Denbighshire, generating since 15 March 2016. Planning permission was granted on 14 January 2015, 3 months after submission. Operator of record: Rhug Estate.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2016
Solar Photovoltaics
Technology
Rhug Estate
Denbighshire
Authority
Wales

Planning and build timeline

Application submitted17 October 2014
Permission granted14 January 2015
3 months after submission
Operational15 March 2016
14 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Denbighshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rhug Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1.54.9 km
Wind Onshore · Operational
9.25 km
Wind Onshore · Operational
2.69.7 km
Wind Onshore · Operational
969.8 km
Wind Onshore · Operational
37.614.1 km
Wind Onshore · Operational
21.314.7 km

How big is Rhug Estate?

Rhug Estate has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rhug Estate?

REPD records the operator as Rhug Estate. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rhug Estate approved and built?

The application was submitted on 17 October 2014. Permission was granted on 14 January 2015, 3 months later. The site became operational on 15 March 2016, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4738.