Hafoty Ucha '2' and '3' Wind Turbine

Hafoty Ucha '2' and '3' Wind Turbine is operational in Conwy with a recorded capacity of 2.6 MW, and has been generating since 2002-12-15.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-12-15
Wind Onshore
Technology
Private Developer
Conwy
Authority
Wales

Planning and build timeline

Application submitted2001-07-02
Permission granted2001-10-17
4 months after submission
Operational2002-12-15
14 months after consent

Conwy’s record on onshore wind

Conwy has decided 7 onshore wind schemes and approved 57%, taking a median of 6.3 months. See every onshore wind scheme decision in Conwy

Other built sites within 15 km

SiteMWDistance
Bodtegir
Wind Onshore · Operational
1.56.5 km
Llyn Celyn
Small Hydro · Operational
4.58.1 km
Rhug Estate
Solar Photovoltaics · Operational
1.29.7 km
Clocaenog Forest Wind Farm
Wind Onshore · Operational
9610.7 km
Wern Ddu Wind Farm
Wind Onshore · Operational
9.212.7 km
Brenig Wind Farm
Wind Onshore · Operational
37.613.8 km
Tir Mostyn And Foel Goch Wind Farm
Wind Onshore · Operational
21.314.9 km

How big is Hafoty Ucha '2' and '3' Wind Turbine?

Hafoty Ucha '2' and '3' Wind Turbine has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hafoty Ucha '2' and '3' Wind Turbine?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hafoty Ucha '2' and '3' Wind Turbine approved and built?

The application was submitted on 2001-07-02. Permission was granted on 2001-10-17, 4 months later. The site became operational on 2002-12-15, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2568.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council