Renewable sites › Hafoty Ucha '2' and '3' Wind Turbine
Hafoty Ucha '2' and '3' Wind Turbine
Hafoty Ucha '2' and '3' Wind Turbine is operational in Conwy with a recorded capacity of 2.6 MW, and has been generating since 2002-12-15.
Planning and build timeline
| Application submitted | 2001-07-02 |
| Permission granted | 2001-10-17 4 months after submission |
| Operational | 2002-12-15 14 months after consent |
Conwy’s record on onshore wind
Conwy has decided 7 onshore wind schemes and approved 57%, taking a median of 6.3 months. See every onshore wind scheme decision in Conwy →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bodtegir Wind Onshore · Operational | 1.5 | 6.5 km |
Llyn Celyn Small Hydro · Operational | 4.5 | 8.1 km |
Rhug Estate Solar Photovoltaics · Operational | 1.2 | 9.7 km |
Clocaenog Forest Wind Farm Wind Onshore · Operational | 96 | 10.7 km |
Wern Ddu Wind Farm Wind Onshore · Operational | 9.2 | 12.7 km |
Brenig Wind Farm Wind Onshore · Operational | 37.6 | 13.8 km |
Tir Mostyn And Foel Goch Wind Farm Wind Onshore · Operational | 21.3 | 14.9 km |
How big is Hafoty Ucha '2' and '3' Wind Turbine?
Hafoty Ucha '2' and '3' Wind Turbine has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hafoty Ucha '2' and '3' Wind Turbine?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hafoty Ucha '2' and '3' Wind Turbine approved and built?
The application was submitted on 2001-07-02. Permission was granted on 2001-10-17, 4 months later. The site became operational on 2002-12-15, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2568.