Novarly ParcelRenewable sites

Renewable sitesWellingborough Solar Farm

Wellingborough Solar Farm

Wellingborough Solar Farm is operational in North Northamptonshire with a recorded capacity of 8.5 MW, and has been generating since 2014-03-31.

8.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-31
Solar Photovoltaics
Technology
Lark Energy
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2013-07-22
Permission granted2013-10-09
3 months after submission
Operational2014-03-31
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on solar

North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
London Road, Irchester - Solar Farm
Solar Photovoltaics · Operational
261.6 km
Little Irchester, Higham Road Solar Farm
Solar Photovoltaics · Operational
4.62.8 km
Sidegate Lane Landfill Site
Landfill Gas · Operational
1.35.2 km
Sidegate Lane
Landfill Gas · Operational
2.45.3 km
Sywell Road
Solar Photovoltaics · Operational
56.2 km
Airfield Farm (Podington)
Wind Onshore · Operational
8.67.7 km
Glebe Farm Solar Energy Park
Solar Photovoltaics · Operational
157.8 km
Burton Wold Wind Farm South
Wind Onshore · Operational
7.58.4 km

How big is Wellingborough Solar Farm?

Wellingborough Solar Farm has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wellingborough Solar Farm?

REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wellingborough Solar Farm approved and built?

The application was submitted on 2013-07-22. Permission was granted on 2013-10-09, 3 months later. The site became operational on 2014-03-31, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2380.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council