Sywell Road
Sywell Road is an operational 5 MW solar farm in North Northamptonshire, generating since 23 March 2017. Planning permission was granted on 29 October 2014, 5 months after submission. Operator of record: NESF (formerly Lark Energy).
Planning and build timeline
| Application submitted | 5 June 2014 |
| Permission granted | 29 October 2014 5 months after submission |
| Operational | 23 March 2017 29 months after consent |
Screening a site of your own?
North Northamptonshire approves 98% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Sywell Road’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Northamptonshire’s record on solar
North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 8.5 | 6.2 km |
Solar Photovoltaics · Operational | 26 | 7.8 km |
Landfill Gas · Operational | 1.3 | 8.4 km |
Solar Photovoltaics · Operational | 4.6 | 8.5 km |
Landfill Gas · Operational | 2.4 | 8.6 km |
Wind Onshore · Operational | 7.5 | 10 km |
Biomass (dedicated) · Operational | 1.9 | 10.3 km |
Wind Onshore · Operational | 14.4 | 10.7 km |
How big is Sywell Road?
Sywell Road has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sywell Road?
REPD records the operator as NESF (formerly Lark Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sywell Road approved and built?
The application was submitted on 5 June 2014. Permission was granted on 29 October 2014, 5 months later. The site became operational on 23 March 2017, 29 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1910.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode