Sywell Road is operational in North Northamptonshire with a recorded capacity of 5 MW, and has been generating since 2017-03-23.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-23
Solar Photovoltaics
Technology
NESF (formerly Lark Energy)
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2014-06-05
Permission granted2014-10-29
5 months after submission
Operational2017-03-23
29 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on solar

North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Wellingborough Solar Farm
Solar Photovoltaics · Operational
8.56.2 km
London Road, Irchester - Solar Farm
Solar Photovoltaics · Operational
267.8 km
Sidegate Lane Landfill Site
Landfill Gas · Operational
1.38.4 km
Little Irchester, Higham Road Solar Farm
Solar Photovoltaics · Operational
4.68.5 km
Sidegate Lane
Landfill Gas · Operational
2.48.6 km
Burton Wold Wind Farm South
Wind Onshore · Operational
7.510 km
Northampton General Hospital
Biomass (dedicated) · Operational
1.910.3 km
Burton Wold Wind Farm - Northern Extension
Wind Onshore · Operational
14.410.7 km

How big is Sywell Road?

Sywell Road has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sywell Road?

REPD records the operator as NESF (formerly Lark Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sywell Road approved and built?

The application was submitted on 2014-06-05. Permission was granted on 2014-10-29, 5 months later. The site became operational on 2017-03-23, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1910.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council