Novarly ParcelRenewable sites

Renewable sitesSidegate Lane Landfill Site

Sidegate Lane Landfill Site

Sidegate Lane Landfill Site is operational in North Northamptonshire with a recorded capacity of 1.3 MW, and has been generating since 1996-08-01.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1996-08-01
Landfill Gas
Technology
East Midlands Electricity Generation
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted1995-04-26
Permission granted1995-06-09
1 months after submission
Operational1996-08-01
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Sidegate Lane
Landfill Gas · Operational
2.40.2 km
Burton Wold Wind Farm South
Wind Onshore · Operational
7.53.4 km
Little Irchester, Higham Road Solar Farm
Solar Photovoltaics · Operational
4.63.8 km
Burton Wold Wind Farm - Northern Extension
Wind Onshore · Operational
14.44.3 km
Burton Wold Windfarm
Wind Onshore · Operational
204.3 km
London Road, Irchester - Solar Farm
Solar Photovoltaics · Operational
265 km
Wellingborough Solar Farm
Solar Photovoltaics · Operational
8.55.2 km
Cranford
Landfill Gas · Operational
1.16.1 km

How big is Sidegate Lane Landfill Site?

Sidegate Lane Landfill Site has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sidegate Lane Landfill Site?

REPD records the operator as East Midlands Electricity Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sidegate Lane Landfill Site approved and built?

The application was submitted on 1995-04-26. Permission was granted on 1995-06-09, 1 months later. The site became operational on 1996-08-01, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 738.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council