Novarly ParcelRenewable sites

Renewable sitesFernbrook AD Plant (Waste AD)

Fernbrook AD Plant (Waste AD)

Fernbrook AD Plant (Waste AD) is operational in North Northamptonshire with a recorded capacity of 1.5 MW, and has been generating since 2010-09-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-09-01
Anaerobic Digestion
Technology
Fernbrook Bio Limited
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2009-05-08
Permission granted2009-10-22
5 months after submission
Operational2010-09-01
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
New Albion Wind Farm
Wind Onshore · Operational
14.44.3 km
Gaultney Solar Park
Solar Photovoltaics · Operational
20.54.6 km
Eckland Lodge Farm
Solar Photovoltaics · Operational
2.97.3 km
Burton Wold Wind Farm - Northern Extension
Wind Onshore · Operational
14.49.6 km
Cranford
Landfill Gas · Operational
1.19.9 km
Burton Wold Wind Farm South
Wind Onshore · Operational
7.59.9 km
Burton Wold Windfarm
Wind Onshore · Operational
2010.1 km
Jacksons Bakery - Solar Panels
Solar Photovoltaics · Under Construction
0.6311.7 km

How big is Fernbrook AD Plant (Waste AD)?

Fernbrook AD Plant (Waste AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fernbrook AD Plant (Waste AD)?

REPD records the operator as Fernbrook Bio Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fernbrook AD Plant (Waste AD) approved and built?

The application was submitted on 2009-05-08. Permission was granted on 2009-10-22, 5 months later. The site became operational on 2010-09-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 226.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council