Renewable sites › Seaton Road Solar Farm
Seaton Road Solar Farm
Seaton Road Solar Farm is operational in Rutland with a recorded capacity of 4 MW, and has been generating since 2017-03-31.
Planning and build timeline
| Application submitted | 2015-07-23 |
| Permission granted | 2015-09-30 2 months after submission |
| Operational | 2017-03-31 18 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rutland’s record on solar
Rutland has decided 9 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in Rutland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Jacksons Bakery - Solar Panels Solar Photovoltaics · Under Construction | 0.63 | 9.6 km |
Weldon Phase 1 and 2 Landfill Gas · Operational | 4 | 11.9 km |
Ketton solar farm Solar Photovoltaics · Operational | 9 | 12.1 km |
Ketton solar farm - phase 2 Solar Photovoltaics · Operational | 3 | 12.1 km |
How big is Seaton Road Solar Farm?
Seaton Road Solar Farm has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Seaton Road Solar Farm?
REPD records the operator as SBC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Seaton Road Solar Farm approved and built?
The application was submitted on 2015-07-23. Permission was granted on 2015-09-30, 2 months later. The site became operational on 2017-03-31, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5532.
Novarly Parcel · official public data, read properly · parcel.novarly.com