Renewable sitesSeaton Road Solar Farm

Seaton Road Solar Farm

Seaton Road Solar Farm is an operational 4 MW solar farm in Rutland, generating since 31 March 2017. Planning permission was granted on 30 September 2015, 2 months after submission. Operator of record: SBC Renewables.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Solar Photovoltaics
Technology
SBC Renewables
Rutland
Authority
England

Planning and build timeline

Application submitted23 July 2015
Permission granted30 September 2015
2 months after submission
Operational31 March 2017
18 months after consent

Screening a site of your own?

RedlineUK · £39

Rutland approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Seaton Road Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rutland’s record on solar

Rutland has decided 9 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in Rutland

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.639.6 km
Landfill Gas · Operational
411.9 km
Solar Photovoltaics · Operational
912.1 km
Solar Photovoltaics · Operational
312.1 km

How big is Seaton Road Solar Farm?

Seaton Road Solar Farm has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Seaton Road Solar Farm?

REPD records the operator as SBC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Seaton Road Solar Farm approved and built?

The application was submitted on 23 July 2015. Permission was granted on 30 September 2015, 2 months later. The site became operational on 31 March 2017, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5532.