Novarly ParcelRenewable sites

Renewable sitesButchersfield Landfill Site

Butchersfield Landfill Site

Butchersfield Landfill Site is operational in Warrington with a recorded capacity of 3 MW, and has been generating since 1995-10-16.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 1995-10-16
Landfill Gas
Technology
NORWEB Generation Limited
Warrington
Authority
England

Planning and build timeline

Application submitted1995-04-28
Permission granted1995-09-05
4 months after submission
Operational1995-10-16
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Risley Sets 13 & 14
Landfill Gas · Operational
2.14.4 km
Risley
Landfill Gas · Operational
24.6 km
Risley '4' Landfill Scheme
Landfill Gas · Operational
5.94.6 km
SAICA Paper Mill
Biomass (dedicated) · Operational
41.65.3 km
Warrington Home Solar Scheme
Solar Photovoltaics · Operational
5.38 km
Former St Michaels Golf Course
Solar Photovoltaics · Under Construction
19 km
Tesco Extra Altrincham
Solar Photovoltaics · Under Construction
0.59.2 km
Whitehead Landfill
Landfill Gas · Operational
5.310.7 km

How big is Butchersfield Landfill Site?

Butchersfield Landfill Site has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Butchersfield Landfill Site?

REPD records the operator as NORWEB Generation Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Butchersfield Landfill Site approved and built?

The application was submitted on 1995-04-28. Permission was granted on 1995-09-05, 4 months later. The site became operational on 1995-10-16, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 577.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council