Renewable sites › Tiln Farm Solar Farm
Tiln Farm Solar Farm
Tiln Farm Solar Farm is under construction in Bassetlaw with a recorded capacity of 49.9 MW.
Planning and build timeline
| Application submitted | 2020-11-06 |
| Permission granted | 2023-09-26 35 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bassetlaw’s record on solar
Bassetlaw has decided 23 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in Bassetlaw →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tiln Farm solar park Solar Photovoltaics · Operational | 8 | 0.9 km |
Tiln Farm Retford (extension) Solar Photovoltaics · Operational | 1.7 | 1 km |
Sutton Grange AD Plant Anaerobic Digestion · Operational | 3 | 2.3 km |
Barnby Moor Solar Photovoltaics · Operational | 4 | 3.7 km |
Walmoor Farm solar park Solar Photovoltaics · Operational | 4 | 5 km |
Walkers Wood Solar Park Solar Photovoltaics · Operational | 27 | 5.3 km |
Little Morton Solar Farm Solar Photovoltaics · Operational | 14.3 | 5.7 km |
Jubilee Farm, Barnby Moor Solar Photovoltaics · Operational | 5 | 6.5 km |
How big is Tiln Farm Solar Farm?
Tiln Farm Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tiln Farm Solar Farm?
REPD records the operator as Lightsource SPV 154 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tiln Farm Solar Farm approved and built?
The application was submitted on 2020-11-06. Permission was granted on 2023-09-26, 35 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7561.