Tiln Farm Retford (extension)
Tiln Farm Retford (extension) is an operational 1.7 MW solar farm in Bassetlaw, generating since 1 April 2015. Planning permission was granted on 23 June 2015, 3 months after submission. Operator of record: Pfalz Solar.
Planning and build timeline
| Application submitted | 24 March 2015 |
| Permission granted | 23 June 2015 3 months after submission |
| Operational | 1 April 2015 |
Screening a site of your own?
Bassetlaw approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Tiln Farm Retford (extension)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bassetlaw’s record on solar
Bassetlaw has decided 23 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in Bassetlaw →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 8 | 0.2 km |
Solar Photovoltaics · Under Construction | 49.9 | 1 km |
Anaerobic Digestion · Operational | 3 | 2.7 km |
Solar Photovoltaics · Operational | 4 | 4.6 km |
Solar Photovoltaics · Operational | 4 | 5.1 km |
Solar Photovoltaics · Operational | 27 | 6.2 km |
Solar Photovoltaics · Operational | 14.3 | 6.6 km |
Solar Photovoltaics · Operational | 5 | 7.3 km |
How big is Tiln Farm Retford (extension)?
Tiln Farm Retford (extension) has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tiln Farm Retford (extension)?
REPD records the operator as Pfalz Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tiln Farm Retford (extension) approved and built?
The application was submitted on 24 March 2015. Permission was granted on 23 June 2015, 3 months later. The site became operational on 1 April 2015.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5167.