Wryde Croft is an operational 26 MW onshore wind farm in Peterborough, generating since 20 February 2016. Planning permission was granted on 1 April 2010, 45 months after submission. Operator of record: Renewable Energy Systems (RES).

26 MW
Capacity
as recorded in REPD
Operational
Status
since 20 February 2016
Wind Onshore
Technology
Renewable Energy Systems (RES)
Peterborough
Authority
England

Planning and build timeline

Application submitted1 July 2006
Permission granted1 April 2010
45 months after submission
Operational20 February 2016
71 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Peterborough: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wryde Croft’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
45.4 km
Solar Photovoltaics · Operational
0.29 km
Solar Photovoltaics · Operational
59.2 km
Anaerobic Digestion · Operational
1.89.3 km
Wind Onshore · Operational
1610 km
Anaerobic Digestion · Operational
1.510.4 km
Wind Onshore · Operational
1410.9 km
Wind Onshore · Operational
211.3 km

How big is Wryde Croft?

Wryde Croft has a recorded installed capacity of 26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wryde Croft?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wryde Croft approved and built?

The application was submitted on 1 July 2006. Permission was granted on 1 April 2010, 45 months later. The site became operational on 20 February 2016, 71 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4248.

Novarly Parcel · official public data, read properly · parcel.novarly.com