Wryde Croft is operational in Peterborough with a recorded capacity of 26 MW, and has been generating since 2016-02-20.
Planning and build timeline
| Application submitted | 2006-07-01 |
| Permission granted | 2010-04-01 45 months after submission |
| Operational | 2016-02-20 71 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
French Farm Wind Onshore · Operational | 4 | 5.4 km |
Volmary Site Solar Photovoltaics · Operational | 0.2 | 9 km |
Decoy Farm Solar Photovoltaics · Operational | 5 | 9.2 km |
Decoy Farm (Farm AD) Anaerobic Digestion · Operational | 1.8 | 9.3 km |
Coldham Wind Onshore · Operational | 16 | 10 km |
Fenmarc Fenland AD Plant (Waste AD) Anaerobic Digestion · Operational | 1.5 | 10.4 km |
Coldham Hall Wind Onshore · Operational | 14 | 10.9 km |
Long Hill Road Wind Onshore · Operational | 2 | 11.3 km |
How big is Wryde Croft?
Wryde Croft has a recorded installed capacity of 26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wryde Croft?
REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wryde Croft approved and built?
The application was submitted on 2006-07-01. Permission was granted on 2010-04-01, 45 months later. The site became operational on 2016-02-20, 71 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4248.