Upper Wick Solar Farm

Upper Wick Solar Farm is operational in Stroud with a recorded capacity of 5 MW, and has been generating since 2016-01-18.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-18
Solar Photovoltaics
Technology
Upper Wick Solar Farm
Stroud
Authority
England

Planning and build timeline

Application submitted2014-11-07
Permission granted2015-01-14
2 months after submission
Operational2016-01-18
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stroud’s record on solar

Stroud has decided 24 solar farms and approved 88%, taking a median of 3 months. See every solar farm decision in Stroud

Other built sites within 15 km

SiteMWDistance
Land At Actrees Farm
Solar Photovoltaics · Operational
51.8 km
Upper Huntingford Farm
Solar Photovoltaics · Operational
7.72.6 km
Building F, Renishaw Factory
Solar Photovoltaics · Operational
0.24 km
Rednock School - Solar Panels
Solar Photovoltaics · Under Construction
0.214.1 km
Land at Box Road
Solar Photovoltaics · Operational
2.26.6 km
Mounteneys and Cherry Rock Wind Turbines
Wind Onshore · Operational
17.3 km
Sharpness Docks
Wind Onshore · Operational
28 km
Hillhouse Farm
Solar Photovoltaics · Operational
28.58.3 km

How big is Upper Wick Solar Farm?

Upper Wick Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Upper Wick Solar Farm?

REPD records the operator as Upper Wick Solar Farm. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Upper Wick Solar Farm approved and built?

The application was submitted on 2014-11-07. Permission was granted on 2015-01-14, 2 months later. The site became operational on 2016-01-18, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4751.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council