Rednock School - Solar Panels is under construction in Stroud with a recorded capacity of 0.21 MW.

0.21 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Immersa Limited
Stroud
Authority
England

Planning and build timeline

Application submitted2024-07-23
Permission granted2024-09-09
2 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stroud’s record on solar

Stroud has decided 24 solar farms and approved 88%, taking a median of 3 months. See every solar farm decision in Stroud

Other built sites within 15 km

SiteMWDistance
Land at Box Road
Solar Photovoltaics · Operational
2.23.5 km
Upper Wick Solar Farm
Solar Photovoltaics · Operational
54.1 km
Land At Actrees Farm
Solar Photovoltaics · Operational
54.3 km
Hillhouse Farm
Solar Photovoltaics · Operational
28.55.5 km
Upper Huntingford Farm
Solar Photovoltaics · Operational
7.75.9 km
Building F, Renishaw Factory
Solar Photovoltaics · Operational
0.25.9 km
Renishaw PLC Factory
Solar Photovoltaics · Operational
0.88.4 km
Sharpness Docks
Wind Onshore · Operational
29.4 km

How big is Rednock School - Solar Panels?

Rednock School - Solar Panels has a recorded installed capacity of 0.21 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rednock School - Solar Panels?

REPD records the operator as Immersa Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rednock School - Solar Panels approved and built?

The application was submitted on 2024-07-23. Permission was granted on 2024-09-09, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16739.