Renewable sitesMounteneys and Cherry Rock Wind Turbines

Mounteneys and Cherry Rock Wind Turbines

Mounteneys and Cherry Rock Wind Turbines is operational in Stroud with a recorded capacity of 1 MW, and has been generating since 2017-03-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-01
Wind Onshore
Technology
Resilient Energy Mounteneys Renewables
Stroud
Authority
England

Planning and build timeline

Application submitted2012-02-07
Permission grantednot recorded
Operational2017-03-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Building F, Renishaw Factory
Solar Photovoltaics · Operational
0.23.7 km
Upper Huntingford Farm
Solar Photovoltaics · Operational
7.74.8 km
Tower Hill Farm
Solar Photovoltaics · Operational
8.16 km
Larks Green Solar Farm
Battery · Operational
49.56.8 km
Larks Green Solar Farm
Solar Photovoltaics · Operational
706.8 km
Upper Wick Solar Farm
Solar Photovoltaics · Operational
57.3 km
Alveston Wind Park
Wind Onshore · Operational
6.98.5 km
Says Court Farm solar park
Solar Photovoltaics · Operational
19.88.8 km

How big is Mounteneys and Cherry Rock Wind Turbines?

Mounteneys and Cherry Rock Wind Turbines has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mounteneys and Cherry Rock Wind Turbines?

REPD records the operator as Resilient Energy Mounteneys Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mounteneys and Cherry Rock Wind Turbines approved and built?

The application was submitted on 2012-02-07. REPD does not record a grant date. The site became operational on 2017-03-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11259.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council