Land At Actrees Farm is an operational 5 MW solar farm in Stroud, generating since 28 January 2016. Planning permission was granted on 29 October 2015, 4 months after submission. Operator of record: Actrees Solar Power/ Vogt Solar.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 28 January 2016
Solar Photovoltaics
Technology
Actrees Solar Power/ Vogt Solar
Stroud
Authority
England

Planning and build timeline

Application submitted26 June 2015
Permission granted29 October 2015
4 months after submission
Operational28 January 2016
3 months after consent

Screening a site of your own?

RedlineUK · £39

Stroud approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land At Actrees Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stroud’s record on solar

Stroud has decided 24 solar farms and approved 88%, taking a median of 3 months. See every solar farm decision in Stroud

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.8 km
Solar Photovoltaics · Operational
7.74.3 km
Solar Photovoltaics · Under Construction
0.214.3 km
Solar Photovoltaics · Operational
2.25.8 km
Solar Photovoltaics · Operational
0.25.8 km
Wind Onshore · Operational
26.3 km
Solar Photovoltaics · Operational
28.57.2 km
Solar Photovoltaics · Operational
58 km

How big is Land At Actrees Farm?

Land At Actrees Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land At Actrees Farm?

REPD records the operator as Actrees Solar Power/ Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land At Actrees Farm approved and built?

The application was submitted on 26 June 2015. Permission was granted on 29 October 2015, 4 months later. The site became operational on 28 January 2016, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5425.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode