Renewable sites › Land at Box Road
Land at Box Road
Land at Box Road is operational in Stroud with a recorded capacity of 2.2 MW, and has been generating since 2016-03-24.
Planning and build timeline
| Application submitted | 2015-06-30 |
| Permission granted | 2015-09-29 3 months after submission |
| Operational | 2016-03-24 6 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stroud’s record on solar
Stroud has decided 24 solar farms and approved 88%, taking a median of 3 months. See every solar farm decision in Stroud →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hillhouse Farm Solar Photovoltaics · Operational | 28.5 | 1.9 km |
Rednock School - Solar Panels Solar Photovoltaics · Under Construction | 0.21 | 3.5 km |
Land At Actrees Farm Solar Photovoltaics · Operational | 5 | 5.8 km |
Renishaw PLC Factory Solar Photovoltaics · Operational | 0.8 | 5.8 km |
Upper Wick Solar Farm Solar Photovoltaics · Operational | 5 | 6.6 km |
Sharpness Docks Wind Onshore · Operational | 2 | 8.3 km |
Upper Huntingford Farm Solar Photovoltaics · Operational | 7.7 | 8.9 km |
Building F, Renishaw Factory Solar Photovoltaics · Operational | 0.2 | 9.4 km |
How big is Land at Box Road?
Land at Box Road has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land at Box Road?
REPD records the operator as Suncredit UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land at Box Road approved and built?
The application was submitted on 2015-06-30. Permission was granted on 2015-09-29, 3 months later. The site became operational on 2016-03-24, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5442.