Building F, Renishaw Factory is an operational 0.2 MW solar farm in Stroud, generating since 1 April 2020. Planning permission was granted on 4 March 2022, 40 months after submission. Operator of record: Renishaw Group.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2020
Solar Photovoltaics
Technology
Renishaw Group
Stroud
Authority
England

Planning and build timeline

Application submitted13 November 2018
Permission granted4 March 2022
40 months after submission
Operational1 April 2020

Screening a site of your own?

RedlineUK · £39

Stroud approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Building F, Renishaw Factory’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stroud’s record on solar

Stroud has decided 24 solar farms and approved 88%, taking a median of 3 months. See every solar farm decision in Stroud

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
7.72 km
Wind Onshore · Operational
13.7 km
Solar Photovoltaics · Operational
54 km
Solar Photovoltaics · Operational
55.8 km
Solar Photovoltaics · Under Construction
0.215.9 km
Solar Photovoltaics · Operational
8.17.6 km
Solar Photovoltaics · Operational
709.2 km
Battery · Operational
49.59.2 km

How big is Building F, Renishaw Factory?

Building F, Renishaw Factory has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Building F, Renishaw Factory?

REPD records the operator as Renishaw Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Building F, Renishaw Factory approved and built?

The application was submitted on 13 November 2018. Permission was granted on 4 March 2022, 40 months later. The site became operational on 1 April 2020.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6742.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode