Building F, Renishaw Factory
Building F, Renishaw Factory is an operational 0.2 MW solar farm in Stroud, generating since 1 April 2020. Planning permission was granted on 4 March 2022, 40 months after submission. Operator of record: Renishaw Group.
Planning and build timeline
| Application submitted | 13 November 2018 |
| Permission granted | 4 March 2022 40 months after submission |
| Operational | 1 April 2020 |
Screening a site of your own?
Stroud approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Building F, Renishaw Factory’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stroud’s record on solar
Stroud has decided 24 solar farms and approved 88%, taking a median of 3 months. See every solar farm decision in Stroud →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 7.7 | 2 km |
Wind Onshore · Operational | 1 | 3.7 km |
Solar Photovoltaics · Operational | 5 | 4 km |
Solar Photovoltaics · Operational | 5 | 5.8 km |
Solar Photovoltaics · Under Construction | 0.21 | 5.9 km |
Solar Photovoltaics · Operational | 8.1 | 7.6 km |
Solar Photovoltaics · Operational | 70 | 9.2 km |
Battery · Operational | 49.5 | 9.2 km |
How big is Building F, Renishaw Factory?
Building F, Renishaw Factory has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Building F, Renishaw Factory?
REPD records the operator as Renishaw Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Building F, Renishaw Factory approved and built?
The application was submitted on 13 November 2018. Permission was granted on 4 March 2022, 40 months later. The site became operational on 1 April 2020.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6742.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode