Upper Farm solar park

Upper Farm solar park is operational in Basingstoke and Deane with a recorded capacity of 12 MW, and has been generating since 2015-03-30.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-30
Solar Photovoltaics
Technology
Kronos Solar
Basingstoke and Deane
Authority
England

Planning and build timeline

Application submitted2013-06-13
Permission granted2014-08-12
14 months after submission
Operational2015-03-30
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Basingstoke and Deane’s record on solar

Basingstoke and Deane has decided 21 solar farms and approved 86%, taking a median of 3.4 months. See every solar farm decision in Basingstoke and Deane

Other built sites within 15 km

SiteMWDistance
Frying Down Copse Solar Farm
Solar Photovoltaics · Operational
55.1 km
Green Waste Composting Facility (Waste AD)
Anaerobic Digestion · Operational
1.25.5 km
Carousel Dairy AD Plant (Farm AD)
Anaerobic Digestion · Operational
1.55.6 km
Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant
Anaerobic Digestion · Under Construction
5.6 km
Alton Sport Centre - Solar Panels
Solar Photovoltaics · Operational
0.378.5 km
Bishops Sutton
Solar Photovoltaics · Operational
1210.6 km
Barley Wood Farm Lane
Solar Photovoltaics · Operational
5.410.6 km
Land to the north and south of Cakers Lane (Wilsom)
Solar Photovoltaics · Operational
1111 km

How big is Upper Farm solar park?

Upper Farm solar park has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Upper Farm solar park?

REPD records the operator as Kronos Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Upper Farm solar park approved and built?

The application was submitted on 2013-06-13. Permission was granted on 2014-08-12, 14 months later. The site became operational on 2015-03-30, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2082.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council