Renewable sites › Green Waste Composting Facility (Waste AD)
Green Waste Composting Facility (Waste AD)
Green Waste Composting Facility (Waste AD) is an operational 1.2 MW anaerobic digestion plant in Basingstoke and Deane, generating since 20 May 2014. Planning permission was granted on 9 July 2012, 2 months after submission. Operator of record: Barfoot Energy Projects.
Planning and build timeline
| Application submitted | 2 May 2012 |
| Permission granted | 9 July 2012 2 months after submission |
| Operational | 20 May 2014 22 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Basingstoke and Deane: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Green Waste Composting Facility (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — River Itchen SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Under Construction | — | 0.4 km |
Solar Photovoltaics · Operational | 5 | 0.4 km |
Anaerobic Digestion · Operational | 1.5 | 4.5 km |
Solar Photovoltaics · Operational | 12 | 5.5 km |
EfW Incineration · Operational | 8 | 8.6 km |
Anaerobic Digestion · Operational | 1.2 | 8.6 km |
Solar Photovoltaics · Operational | 0.37 | 10.2 km |
Solar Photovoltaics · Operational | 2.8 | 11 km |
How big is Green Waste Composting Facility (Waste AD)?
Green Waste Composting Facility (Waste AD) has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Green Waste Composting Facility (Waste AD)?
REPD records the operator as Barfoot Energy Projects. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Green Waste Composting Facility (Waste AD) approved and built?
The application was submitted on 2 May 2012. Permission was granted on 9 July 2012, 2 months later. The site became operational on 20 May 2014, 22 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 259.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode