Renewable sites › Alton Sport Centre - Solar Panels
Alton Sport Centre - Solar Panels
Alton Sport Centre - Solar Panels is operational in East Hampshire with a recorded capacity of 0.37 MW, and has been generating since 2025-03-31.
Planning and build timeline
| Application submitted | 2025-03-31 |
| Permission granted | 2025-06-10 2 months after submission |
| Operational | 2025-03-31 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Hampshire’s record on solar
East Hampshire has decided 16 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in East Hampshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Barley Wood Farm Lane Solar Photovoltaics · Operational | 5.4 | 2.8 km |
Land to the north and south of Cakers Lane (Wilsom) Solar Photovoltaics · Operational | 11 | 3 km |
Wilsom Farm Solar Photovoltaics · Operational | 11 | 3 km |
Upper Farm solar park Solar Photovoltaics · Operational | 12 | 8.5 km |
Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant Anaerobic Digestion · Under Construction | — | 9.9 km |
Frying Down Copse Solar Farm Solar Photovoltaics · Operational | 5 | 10.1 km |
Green Waste Composting Facility (Waste AD) Anaerobic Digestion · Operational | 1.2 | 10.2 km |
Marsh House Solar Park Solar Photovoltaics · Operational | 5.5 | 12.5 km |
How big is Alton Sport Centre - Solar Panels?
Alton Sport Centre - Solar Panels has a recorded installed capacity of 0.37 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Alton Sport Centre - Solar Panels?
REPD records the operator as East Hampshire District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Alton Sport Centre - Solar Panels approved and built?
The application was submitted on 2025-03-31. Permission was granted on 2025-06-10, 2 months later. The site became operational on 2025-03-31.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 19627.