Renewable sites › Barley Wood Farm Lane
Barley Wood Farm Lane
Barley Wood Farm Lane is operational in East Hampshire with a recorded capacity of 5.4 MW, and has been generating since 2015-03-20.
Planning and build timeline
| Application submitted | 2013-12-09 |
| Permission granted | 2014-03-31 4 months after submission |
| Operational | 2015-03-20 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Hampshire’s record on solar
East Hampshire has decided 16 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in East Hampshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Alton Sport Centre - Solar Panels Solar Photovoltaics · Operational | 0.37 | 2.8 km |
Wilsom Farm Solar Photovoltaics · Operational | 11 | 3.7 km |
Land to the north and south of Cakers Lane (Wilsom) Solar Photovoltaics · Operational | 11 | 3.7 km |
Upper Farm solar park Solar Photovoltaics · Operational | 12 | 10.6 km |
Whitman Laboratories Solar Photovoltaics · Operational | 1 | 12.2 km |
Bishops Sutton Solar Photovoltaics · Operational | 12 | 12.6 km |
Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant Anaerobic Digestion · Under Construction | — | 12.7 km |
Frying Down Copse Solar Farm Solar Photovoltaics · Operational | 5 | 12.8 km |
How big is Barley Wood Farm Lane?
Barley Wood Farm Lane has a recorded installed capacity of 5.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Barley Wood Farm Lane?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Barley Wood Farm Lane approved and built?
The application was submitted on 2013-12-09. Permission was granted on 2014-03-31, 4 months later. The site became operational on 2015-03-20, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1474.
Novarly Parcel · official public data, read properly · parcel.novarly.com