Novarly ParcelRenewable sites

Renewable sitesBishops Sutton

Bishops Sutton

Bishops Sutton is operational in Winchester with a recorded capacity of 12 MW, and has been generating since 2014-03-27.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-27
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Winchester
Authority
England

Planning and build timeline

Application submitted2013-09-02
Permission granted2013-11-15
2 months after submission
Operational2014-03-27
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Winchester’s record on solar

Winchester has decided 24 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in Winchester

Other built sites within 15 km

SiteMWDistance
Upper Farm solar park
Solar Photovoltaics · Operational
1210.6 km
Barley Wood Farm Lane
Solar Photovoltaics · Operational
5.412.6 km
Alton Sport Centre - Solar Panels
Solar Photovoltaics · Operational
0.3712.7 km
Three Maids Hill Solar Farm
Solar Photovoltaics · Operational
2514.2 km

How big is Bishops Sutton?

Bishops Sutton has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bishops Sutton?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bishops Sutton approved and built?

The application was submitted on 2013-09-02. Permission was granted on 2013-11-15, 2 months later. The site became operational on 2014-03-27, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1282.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council