Novarly ParcelRenewable sites

Renewable sitesBushywarren Lane, Ellisfield - Anaerobic Digestor Plant

Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant

Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant is an anaerobic digestion plant under construction in Basingstoke and Deane. Planning permission was granted on 20 May 2021, 4 months after submission. Operator of record: RKE Bio Group Limited.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
RKE Bio Group Limited
Basingstoke and Deane
Authority
England

Planning and build timeline

Application submitted29 January 2021
Permission granted20 May 2021
4 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Basingstoke and Deane: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.20.4 km
Solar Photovoltaics · Operational
50.7 km
Anaerobic Digestion · Operational
1.54.9 km
Solar Photovoltaics · Operational
125.6 km
EfW Incineration · Operational
88.6 km
Anaerobic Digestion · Operational
1.28.6 km
Solar Photovoltaics · Operational
0.379.9 km
Solar Photovoltaics · Operational
2.811.2 km

How big is Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant?

REPD does not record an installed capacity for Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant.

Who operates Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant?

REPD records the operator as RKE Bio Group Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant approved and built?

The application was submitted on 29 January 2021. Permission was granted on 20 May 2021, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11246.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode