Renewable sites › Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant
Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant
Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant is under construction in Basingstoke and Deane.
Planning and build timeline
| Application submitted | 2021-01-29 |
| Permission granted | 2021-05-20 4 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — River Itchen SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Green Waste Composting Facility (Waste AD) Anaerobic Digestion · Operational | 1.2 | 0.4 km |
Frying Down Copse Solar Farm Solar Photovoltaics · Operational | 5 | 0.7 km |
Carousel Dairy AD Plant (Farm AD) Anaerobic Digestion · Operational | 1.5 | 4.9 km |
Upper Farm solar park Solar Photovoltaics · Operational | 12 | 5.6 km |
Chineham ERF EfW Incineration · Operational | 8 | 8.6 km |
Basingstoke Sewage Treatment Works Anaerobic Digestion · Operational | 1.2 | 8.6 km |
Alton Sport Centre - Solar Panels Solar Photovoltaics · Operational | 0.37 | 9.9 km |
Hill End Farm Solar Photovoltaics · Operational | 2.8 | 11.2 km |
How big is Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant?
REPD does not record an installed capacity for Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant.
Who operates Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant?
REPD records the operator as RKE Bio Group Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant approved and built?
The application was submitted on 2021-01-29. Permission was granted on 2021-05-20, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11246.
Novarly Parcel · official public data, read properly · parcel.novarly.com