Carousel Dairy AD Plant (Farm AD) is an operational 1.5 MW anaerobic digestion plant in Basingstoke and Deane, generating since 10 December 2013. Planning permission was granted on 12 March 2012, 6 months after submission. Operator of record: Biogen (formerly Tamar Energy).
Planning and build timeline
| Application submitted | 30 August 2011 |
| Permission granted | 12 March 2012 6 months after submission |
| Operational | 10 December 2013 21 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Basingstoke and Deane: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Carousel Dairy AD Plant (Farm AD)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 4.2 km |
Anaerobic Digestion · Operational | 1.2 | 4.5 km |
Anaerobic Digestion · Under Construction | — | 4.9 km |
Solar Photovoltaics · Operational | 12 | 5.6 km |
EfW Incineration · Operational | 8 | 10.4 km |
Solar Photovoltaics · Operational | 2.8 | 10.5 km |
Anaerobic Digestion · Operational | 1.2 | 10.5 km |
Solar Photovoltaics · Operational | 4 | 10.6 km |
How big is Carousel Dairy AD Plant (Farm AD)?
Carousel Dairy AD Plant (Farm AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carousel Dairy AD Plant (Farm AD)?
REPD records the operator as Biogen (formerly Tamar Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carousel Dairy AD Plant (Farm AD) approved and built?
The application was submitted on 30 August 2011. Permission was granted on 12 March 2012, 6 months later. The site became operational on 10 December 2013, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 275.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode