Novarly ParcelRenewable sites

Renewable sitesCarousel Dairy AD Plant (Farm AD)

Carousel Dairy AD Plant (Farm AD)

Carousel Dairy AD Plant (Farm AD) is operational in Basingstoke and Deane with a recorded capacity of 1.5 MW, and has been generating since 2013-12-10.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-12-10
Anaerobic Digestion
Technology
Biogen (formerly Tamar Energy)
Basingstoke and Deane
Authority
England

Planning and build timeline

Application submitted2011-08-30
Permission granted2012-03-12
6 months after submission
Operational2013-12-10
21 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Frying Down Copse Solar Farm
Solar Photovoltaics · Operational
54.2 km
Green Waste Composting Facility (Waste AD)
Anaerobic Digestion · Operational
1.24.5 km
Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant
Anaerobic Digestion · Under Construction
4.9 km
Upper Farm solar park
Solar Photovoltaics · Operational
125.6 km
Chineham ERF
EfW Incineration · Operational
810.4 km
Hill End Farm
Solar Photovoltaics · Operational
2.810.5 km
Basingstoke Sewage Treatment Works
Anaerobic Digestion · Operational
1.210.5 km
Overton
Solar Photovoltaics · Operational
410.6 km

How big is Carousel Dairy AD Plant (Farm AD)?

Carousel Dairy AD Plant (Farm AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Carousel Dairy AD Plant (Farm AD)?

REPD records the operator as Biogen (formerly Tamar Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Carousel Dairy AD Plant (Farm AD) approved and built?

The application was submitted on 2011-08-30. Permission was granted on 2012-03-12, 6 months later. The site became operational on 2013-12-10, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 275.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council